Sand making machine equipment maintenance steps

Sand production line equipment system sand machine is generally in open Spaces, poor working conditions.At the same time, with the long time use of equipment, its parts prone to wear and fracture problem.Therefore, to make base maintenance work and so on.Henan Liming heavy industry science and technology co., LTD. Is engaged in the sand making machine equipment research and development production for more than thirty years, has the rich experience, the following introduce sand making machine maintenance steps for the user.

1. Lubrication

(1) Regular attention and timely lubrication of the friction surface ensure the normal operation of the machine and extend its service life.

(2) The grease used in this machine should be based on location and climatic conditions.

(3) The grease added to the bearing seat is replaced by about 50% of the space volume and every 3 to 6 months.

(4) Before the machine starts, proper amount of grease should be injected between the thrust plate and the thrust plate bearing.

2. Maintenance

In order to guarantee the normal work of the sand making machine equipment, the need for planned maintenance.Main content including check and repair the adjustment device, adjust the discharging mouth gap, to wear plate head or replacement.Maintenance transmission parts, lubrication system and change of lubricating oil and so on.Cycle for 1 ~ 3 months or so.In addition, also including the replacement of the thrust plate, plate, check and repair the bearing, etc.Cycle in general is 1 ~ 2 years.In addition, also including change or turning eccentric shaft and the moving jaw mandrel, casting rod head babbitt, replace or repair the wear parts.Cycle generally for 5 years or so.