Mechanical equipment has a life period, but the longevity is also affected by a lot of human factors, for the environment has some influence, crusher is the same, whether it is in the process of daily work, we all should pay attention to timely repair, maintain well, now the crusher models on the market more…
The correct cone crusher operation steps are as follows: 1. The cone crusher before starting, check the lubrication system, the broken area of the cone crusher, correction of belt tensioning degree, check whether screw fastening. 2. Cone crusher to start the oil pump motor 5-10 minutes later, check the work condition of lubrication system, oil…
Preparation: 1. Tools: wrench, pliers, screwdriver, small hammer, shovel, etc; 2. The necessary spare parts: various sub chain, link, bolt, nut, pin crusher of insurance, etc.; 3. The lubricating oil, turbine oil. Inspection and handling: 1. Motor, gear reducer, hydraulic coupling, the nose and the tail part of the connection must be complete, intact and…