Categories
ball mill

Preparation of the ball mill before use


Energy-saving ball mill in the ball mill equipment absolutely occupiers now half, from the energy saving ball mill appeared on the market the moment it is destined to is a trump card in ball mill equipment products, with the application of energy-saving ball mill is more and more widely, people more and more, so we in the use of energy-saving ball mill should be ready for what? That is about to by henan Liming technical personnel to explain in detail for you:

1. Energy saving ball mill before commissioning, will first ball mill bearing and lubricating oil;
2. Review the overall structure of the ball mill is complete, to ensure that each part is normal;
3. The ball mill equipment cleaning itself:
(1) check ball mill front-rear Zi inside and vacuum tube whether there is sundry; (2) the cleaning ball mill bearing, closed to cylinder, coupling parts, ball mill grinding machine place such as bearing, reducer, motor appearance clean; (3) motor with compressed air blowing clean inside, and check the motor internal ever sundry.
4. Oil pipeline flushing, generally with the filtered 40 # engine oil and 20% of rust inhibitor. The tubing to equipment will be removed first, and the oil inlet with blind flange sealing equipment. Into the tubing with temporary pipeline will lead to equipment and prepare to connect flowline, flush with circulating pump, and check in the fuel tank of oil filter oil online, until the filter purchase online without sundry, may think washing qualified in tubing. Then, will the tubing with same circulation pump, rinse clean through, in the ball mill equipment.
5. One by one item by item check ball mill, plate bolt anchor bolt fastening. Check the reliability of the power supply voltage, control of ball mill equipment. Ball mill motor and reducer, reducer coupling of mill and the connecting bolt, or connection parts, rotating the ball mill to separate each part.
6. Check the cooling water pipe for blocking phenomenon.

Though it looks all kinds of steps is very trouble, but as long as we gradually form a good habit, it will have very good effect to the machine and enterprise, if it is not, or to change your company energy-saving ball mill equipment, so please don’t hesitate to choose the henan Liming, we will give you the high quality service and the trust of quality.

Leave a Reply

Your email address will not be published. Required fields are marked *