Impact Crusher’s installation process and precautions


Impact crusher now has a high status in the sand production line, if the installation process crusher equipment, you can not properly installed, it will not only lead to not work properly complete production line, but also to bring the machine itself to compromise, the more serious is the impact crusher will cause the operator to physical threats. Sand each work site will have the first hints security, so in order to crusher itself is responsible for the maintenance and safety of the operator, we must be familiar with the process and considerations crusher installation.

Impact crusher equipment before installation, first conduct an inventory of the packing list, check the various parts for wear during transport and are complete. The installation should Impact crusher leveling it perpendicular to the horizontal axis, the top and sides of the Impact crusher should leave appropriate space to prepare for lifting and maintenance use. After the installation is complete, you should conduct a comprehensive inspection, such as: lubricating oil pipe is connected securely or not.

Impact crusher installation should note the following: Due to the larger Impact crusher vibration during operation, the machine should be installed in the concrete foundation, you can pad to hardwood between Impact crusher and concrete foundation according to the actual situation pad, rubber band or other cushioning material. Row-based mine shafts to laying a layer of a metal plate, and has sufficient inclination angle (depending on the flow of materials should be determined, not less than 50 °), so as not to impede the smooth discharge of the crushed product. Nesting population size should be required to adjust the particle size. When adjusting, loosen the bolts and tension springs T line. Use a bolt from the top to adjust the seat to open the top, insert, or removing the appropriate thickness of the spacer, and then returned from the top bolt, adjust the seat under the action of gravity moving jaw, ear close to the seat frame, while the spacer group pressure rope together. Thereafter, when the spring preload adjustment to ensure that the machines work so that the thrust plate and thrust plate pad close. But pre-pressure should not be too large, it does not happen percussion, finally locking seat adjustment.

Before the formal operation of equipment must be re-add a lubricant, and check the connection between the various parts are secure, if a foreign body, the impeller motor wiring is correct. After the machine is running and, if abnormal situation should immediately stop.

Liming heavy industry‘s Impact crusher equipment is based on the principle of Impact crusher engineered a new type of Impact crusher, depending on the site of crushing, Impact crusher equipment installation site will be different. General installation work at the plant or the open-air venue.My company as a mining crushing solutions provider, will configure the most suitable solution for your production line, we will send a professional team to provide you with technical support and product training. Liming Heavy Industry warmly welcome you to join !